Business Owner | Petronas Carigali Turkmenistan Sdn. Bhd.– Hyundai Engineering Co. |
Employer | İlk İnşaat Taahüt San. Tic. Anonim Şti. |
Name of the Work and Tender Registration Number (If Any) | GTPOGT- Gas Treatment Plant Onshore Gas Terminal |
Place of Work | Turkmenbashi / Turkmenistan |
Work | Tanks: – Crude Oil Tank: 39 Meters Diameter – Lean Rich Meg Storage Tank – 15 Meters – Caustic Storage Tank – 6 Meters – Make-Up Mixing Tank – 6 Meters – Lean Meg Storage Tank – 15 Meters ———————————————— Pipe: Pipe Diameters: ½ ”- 40“ Total 142,000 wdı 58,000 wdı Stainless (35,000 Workshops + 23,000 Fields) 84,000 wdı Carbon Steel Pipe (62,000 Workshops + 22,000 Sites) ———————————————— Steel Construction : Piperack Manufacture: 620 Tons Material: S355j |
Applied Construction Technique | Steel Structure, Mig, Mag, Smaw, Fit-Up Application Techniques, Paint Application Techniques |
Date of Contract | 03.2014 |
Date of Provisional Acceptance | 06.2015 |