Employer | Petronas Carigali (Turkmenistan) Sdn. Bhd. |
Name of the Work and Tender Registration Number (If Any) | EPCC of Central Diyarbekir Oil Development Project Engineering, Procurement, Construction and Hook up and Commissioning of Central Diyarbekir Jacket, Drilling Platform and Topside (CDDP-A) with minimum process facilities. |
Work | Piles Diameter 2.000 mm – thickness: 50.0 mm WT – 1.073 tons Grouting 55 tons Jacket 1 nos 4 legged jacket with 4 skirt leg (total 2.320 tons) Appurtenances (Anodes, Boatlanding,Walkways etc) 1 no of Boat Landing – 80 tons, 355 no’s Anodes – 145 tons Topside Dry weight= 2.627 tons, Operating weight = 4.692 tons Piping 22.545 dia-inch, 2.323 spool Mechanical (Equipment) Erection 40 no’s of mechanical equipment Electrical Installation 600 m cable ladder/tray, 40 km cable, 1.980 glanding, 6.392 termination and other electrical equipment & field electrical devices Instrument Installation 700 m cable ladder/tray, 22 km cable, 2.368 glanding, 16.088 termination, 486 loop test and other instrument equipment & instrument devices. Total tonnage of platform 8.365 tons (operating) Deck Elevations and Sizes Sub-lower Deck-18.00×20.00 m El: +9.000 / Lower Deck-27.00×40.00 m El: +14.000 / Instrument Deck-12.00×32.00 m El: +17.800 / Upper Deck-34.00×37.00 m El: +21.800 |
Date of Contract | 01.2010 |
Provisional Acceptance Date | 11.2015 |